Quality modules
Non-conformances
A non-conformance is a defect in work, material, or process that doesn't meet the requirements (plan, specification, standard). Inspectors and quality control staff open a non-conformance, set a responsible party and an expected close date, and the party handling it documents the work. Once the defect is fixed, you close the non-conformance and notify the relevant people.

Create a new non-conformance#
- Select the project in the Project selector, then click Non Conformances in the side menu.
- At the top of the screen, click + (Create new non-conformance).

- The New non-conformance window opens on the General details section. Opening date is already filled in with today's date. Select a Contractor, then fill in the remaining fields in this section.

- In the Subject field, describe the defect and where it is in one sentence. Then click Non-conformance classification in the window menu.

- In Non-conformance classification, fill in the description, the responsible party, the discipline, and the required corrective action. If needed, go to More details as well.

- Click Structures and select the location on site. If the defect is in several places, click Add location.
- Click Save.

- In the Non-conformance created successfully! message, click Go to non-conformance to attach photos and continue handling it, or click Close.
Every new non-conformance starts with the status Open. Next to each section in the window menu, you can see how many required fields you've already filled in.
On your phone#
- In the list, tap + at the top of the screen, or the floating button in the corner.
- The sections are stacked one below the other. Tap a section to open it, and fill them in order: General details, Non-conformance classification, More details, Structures.
- Tap Save at the bottom of the screen.


Edit an existing non-conformance#
- Find the non-conformance by searching, by using a counter (for example Open), or in the list.
- Click the row or the card (or use the three-dot menu: Edit Non-Conformance). The Detail window opens, with the code in the title.

- In the Navigate in non-conformance menu, select the section you want to change, for example Non-conformance classification or Structures, and edit the fields.
- Click Save at the bottom of the window. The message Details saved successfully appears.
The side menu has two groups:
- Navigate in non-conformance – General details, Non-conformance classification, More details, Structures, Linked objects, Handling steps, Signatures, and File list.
- Operations in non-conformance – Send, Full Report, Empty Report, Add task, Add to calendar, Pin Non-Conformance, and more.
Non-conformances don't have a duplicate action. To document a similar defect, create a new non-conformance.
On your phone#
Tap a status group (for example Open), then tap the card. The non-conformance opens in full screen, with the sections stacked one below the other. Tap a section, make your changes, and tap Save at the bottom.

What you see on the screen#
At the top of the screen is the title Non Conformances, with these buttons beside it: view mode, the export icon (Export Non Conformances), Refresh, and the + button (New non-conformance).
Below the title is a row of counters. Clicking a counter filters the list, and clicking the same counter again clears the filter:
| Counter | What it shows |
|---|---|
| Total | All non-conformances in the project |
| Open | Non-conformances that are still being handled |
| Closed | Non-conformances that have been closed |
| Overdue | Open non-conformances whose expected close date has passed |
View modes#
- Table – Dense rows, handy for scanning and for working on several items at once. Available on desktop only.
- Cards – One card per non-conformance, with the code, subject, opening date, status, and number of overdue days.
- Calendar – Non-conformances are arranged on a monthly calendar by date.
On a phone, the Cards and Calendar views are available. Choosing and arranging table columns is explained in Common tools.
Non-conformances you've pinned appear at the top of the list under Pinned non-conformances.
Search and filter#
- Type in the Search non conformances field. Search looks through all the table columns, plus the subject and the description.
- For a range of codes, fill in From NC code and To NC code.
- To see only non-conformances opened by a specific person, select them in the Contact field (default: All contacts).
- To show a single status, choose Status.
- To change the order, choose Sort by: By NC code or By opening date.
The Status list shows the statuses that actually exist in the project, plus two more options:
- Overdue - Open – Open, and past their due date.
- Overdue - Closed – Closed after their due date.
Advanced filters#
- Click Advanced Filters. The Non-conformance filters window opens.
- Choose a Status and a Severity level.
- Fill in Opening date or Closing date (From date / To date).
- Under Location / Structure, choose a Sub-project, Structure type, Structure, Sub Structure, Element type, and Element, or search using Free search in structures.
- If needed, fill in Certificate number or choose Opened by.
- Click Apply. To reset your selections in the window, click Clear.
Each active filter appears as a tag above the list. Clicking the X on a tag removes that filter, and Clear all removes all of them.

Location, responsible party, and files#
Choose a location#
- In the Structures section, choose a sub-project, structure, floor, and element.
- To mark several elements on the same path, select all of them.
- If the defect is in several places, click Add location and add another path.
The location picker is explained in full in Common tools.
Responsible party and expected closing date#
- The Responsible party (in the Non-conformance classification section) is the company or person who should fix the defect.
- The Expected closing date (in the General details section) is the deadline for the fix. Once it passes, the non-conformance is counted as Overdue and shown in red.
- If you opened a non-conformance and set an expected closing date, the deadline appears in your Tasks and on the Dashboard as a reminder (Expected closing date) for as long as it's open.
Attach photos and files#
You attach photos and files after the first save:
- Open the non-conformance (or click Go to non-conformance after creating it).
- In the window menu, choose File list.
- Click Add files and choose photos or documents. If you'd like, enter a title.
- Click Upload.
For each file, you can choose Edit image, Edit title, Download, or Delete. Attaching files and the image editor are explained in Common tools.

Non-conformance workflow#
Statuses#
| Status | How it's set |
|---|---|
| Open | Every new non-conformance starts with this status. Reopening a closed non-conformance also returns it to this status. |
| Follow-up | Chosen manually in the Status field in the General details section, when handling continues and needs to be tracked. |
| Closed | Only through the Close non-conformance button (see below). |
In an existing non-conformance, the Status field in the General details section is a dropdown list. The options in the list are set in your organization's settings, so you may see additional statuses (for example Follow-up or Ready to close). Click Save to save a status change.
Overdue isn't a status. It's a marker that appears next to the status (for example "Overdue · Open") when the expected closing date has passed.
Step 1: Log handling steps#
In the Handling steps section, you document every action taken to fix the defect.
- Open Handling steps and click Add row.
- Fill in Date, Action type, Transferred to, and Details.
- Click Save at the bottom of the window.
- When the step is complete, click the lock icon in the row (Close step). The Close step window opens.
- Choose a Closing date (required, and it can't be a future date) and click Close step.
The status of each step is shown as Open or Closed. A closed step can't be closed again.
Step 2: Signatures#
In the Signatures section, you approve the non-conformance with a digital signature.
- Open Signatures and click Add row.
- The row is filled in with your name, your role in the project, and your saved signature. Choose a date.
- Click Save.
To set up a saved signature, see Settings.
Step 3: Close the non-conformance#
- Open the non-conformance.
- Fill in all the fields required for closing. Next to each section in the menu, you can see how many are missing, and those fields are marked (Required to close non-conformance).
- Click Close non-conformance at the bottom of the window. The button is only active once all the fields required for closing are filled in.
- In the Close non-conformance window, fill in the closing details defined in the project, for example Actual closing date (default: today, and it can't be a future date), Closure approved by, and the checkbox for approval by an authorized body.
- Click OK. The message Non-conformance closed successfully appears.
After closing, the form is locked for editing, and Reopen closed non-conformance appears at the bottom of the window.
Step 4: Send a notification#
You can send a non-conformance, open or closed, to the relevant people:
- In the Detail window, choose Send in the operations menu (or in the options menu in the list). The send window opens.
- Choose a Distribution list, Contacts, or both. You can also type an email address.
- Check the Message and update it if needed.
- Click Send. The message Message sent successfully appears.
Recipients you choose from Contacts also get a task in Tasks and a notification. Recipients added only through a distribution list or an email address get an email only.
Reopen a closed non-conformance#
- Open the closed non-conformance.
- Click Reopen closed non-conformance at the bottom of the window (or in the options menu: Reopen Closed Non-Conformance).
- In the confirmation window, click OK.
The non-conformance returns to the status Open, and you can edit it again.
What you see by role#
Not every user sees every module and action. Permissions are set by your role in the project. If a module or button is missing, contact the project manager or your organization's system admin.
In Non Conformances, this shows up as follows:
- View only – You can open and read non-conformances and generate reports. There's no + button, and no saving, closing, sending, or reopening.
- Opening non-conformances – Even with edit permission, the + button only appears for roles that are allowed to open non-conformances in the project.
- Different fields – Which fields are shown, and which are required, depends on the role and the project settings.
- Severity – Only some users can change the severity level.
- Opened by role – For some roles, the list of options is limited (for example QA only, or QC only).
- Signature only – Some users can only sign. For them, the form is locked except for the Signatures section, and Save (to save the signature) and Send appear at the bottom.
- Closing and reopening – Limited to authorized users.
More actions from the options menu#
In the three-dot menu on a card, on a table row, or in the Detail window:
- Send – Send a message (see above).
- Full Report – A PDF of the non-conformance with all its details.
- Empty Report – A blank form to print and fill in by hand.
- Add task – A task linked to the non-conformance. See Tasks.
- Add to calendar – Add the non-conformance to your calendar.
- Pin Non-Conformance / Unpin Non-Conformance – Pin it to the top of the list. See Common tools.
- Reopen Closed Non-Conformance – Only on a closed non-conformance.
Act on several non-conformances at once#
- Switch to the Table view.
- Select the checkbox on the rows you want, or the checkbox in the header to select all.
- In the bar that opens, choose an action: Pin (or Unpin Non-Conformance), Add task, Send, or Reopen (only when all the selected rows are closed).
- To clear your selection, click Clear selection.
Export#
- Filter the list as needed, or select rows in the table view.
- Click the export icon (Export Non Conformances) at the top of the screen. The Export Non Conformances window opens.
- Choose a format:
- ZIP – A compressed file with the non-conformance documents.
- Excel – A table of the non-conformances.
- NATI – An Excel file in the Israel National Roads format.
- The file is prepared in the background. Progress appears in the Downloads window, and when it's done, a preview opens with an option to download.
The export includes only what's shown based on the active filters, or only the rows you selected. After a ZIP export, the button waits a few minutes before you can export again, and shows Wait ~X min. For details on exporting and previewing, see Common tools.
Share a link#
- Open the non-conformance.
- In the window title, click Copy link (on a phone: Share).
- Paste the link into a message, an email, or WhatsApp.
Anyone who opens the link goes straight to the non-conformance, as long as they have access to the project. For details, see Common tools.
Frequently asked questions#
Why is the "Close non-conformance" button gray? Some fields required for closing haven't been filled in yet. In the side menu, check which sections are marked as having missing fields.
Why can't I attach a photo to a new non-conformance? Attaching files is only available after the first save. Save, click Go to non-conformance, and then open File list.
Can I change the status without closing? Yes. In an existing non-conformance, choose a different status in the Status field in the General details section and click Save. Closing is only done through Close non-conformance.
I don't see the + button to create a non-conformance. You have view-only permission, or your role isn't allowed to open non-conformances in the project. Contact the project manager.
See also#
- Tasks – The tasks created from sending, and reminders for the expected closing date.
- Reports – A consolidated Non-conformance report by filters, with export.
- Common tools – The location picker, attaching files, export, pinning, and copying a link.
- Settings – Set up your saved signature.