User guide QA-Online PDF

More

Glossary

A–D#

Active / Done – Two tabs on the Tasks screen: what’s still open, and what’s already been handled.

Active project – The project currently shown in the Project selector. Everything you create is saved in it.

All / Mine – A scope toggle in lists: all the items in the project, or only the items assigned to you.

Approval – An action by whoever is responsible for a step in a process: you approve and pass it on, or send it back for correction. See Tasks and approvals.

Bulk signing – Signing the same step on several Checklists at once. See Checklists.

Checklist – A quality-control form divided into steps, which accompanies work carried out on site. See Checklists.

Company – An organization that works on the project: a contractor, subcontractor, supplier, or consultant.

Contact – A person associated with a company in a project. A contact isn’t necessarily a user who can sign in to the system. See Companies and contacts.

Customize menu – Changing the order of items in the side menu, hiding them, and grouping them. See Settings.

Dashboard – The project’s home screen: metrics, tasks, and recent activity. See Dashboard and projects.

Detail window – The window that opens when you click an item in a list. There you view the item, edit it, and perform actions on it. See Getting to know the screen and navigation.

E–H#

Element – The most detailed level in the project structure, for example a slab, a column, or a wall. See Structures.

Expected closing date – The target date for fixing a non-conformance. After it passes, the item counts as Overdue. See Non-conformances.

Favorites – Projects you’ve starred. They appear first in the Project selector.

Field report – A summary of a site walk or a meeting, with tasks assigned to responsible people and tracking of how they’re handled. See Field reports.

For information – A recipient who gets an update about a document without a task being created for them. They don’t need to approve.

Full report / Blank report – A PDF of an item with all its data, signatures, and files (Full report), or an empty form for printing and filling in by hand (Blank report).

I–M#

Inactive – A marker for a company, contact, or user who no longer works on the project. The information is kept, but they no longer appear for selection.

Incoming / Outgoing – Two mailboxes on the Tasks screen. Incoming – what’s waiting for you. Outgoing – what you’ve sent to others.

Lab order – A request to a laboratory to run a test (for example, on concrete), with a result of Pass or Fail. See Tests.

Limited mode – Working with data stored on your device when there’s no stable connection as the system opens. Some of the data may not be up to date. See Sign-in and account.

Location – The place in the project that an item belongs to: subproject, structure, floor, element. You choose it in the location picker. See Common tools.

N–S#

Non-conformance – A defect or deviation from the requirements found on site. It’s documented with a description, location, and photos, assigned to a responsible party, and closed after it’s fixed. See Non-conformances.

Notifications – The bell in the top bar: overdue test orders, tasks sent to you, and suppliers whose approval has expired. See Getting to know the screen and navigation.

Overdue – An item whose due date has passed and that’s still open. Shown in red.

Periodic report – A report that gathers Tests, Checklists, Non-conformances, and documents over a date range. See Reports.

Permission group (role) – Determines which modules and actions are available to a user in a project. See For organization system administrators.

Pin – Keeping an important item at the top of the list so you can find it quickly. Pins are personal and are saved separately for each project. See Common tools.

Plan – A drawing or work plan in the Design module, as a PDF, DWG, or PLT file. See Design.

Plan version – A revision of a plan in the Design module, with a date, stage, and files. One of the versions is marked Current. See Design.

Project selector – The control in the top bar where you choose the active project. See Getting to know the screen and navigation.

QA-Online app – A phone app from Google Play or the App Store that shows the same system and adds push notifications. See Using a phone or tablet.

Quality document – A document in the Project Documents module, such as a protocol, approval, or control form, according to the types your organization has defined. See Project documents.

Recent activity – A personal list of the items you opened most recently, on the Dashboard.

Responsible party – The company or person who is supposed to handle a non-conformance.

Section / Segment – A precise stretch along a long element, such as a road, a pipeline, or a wall.

Side menu – The list of modules at the side of the screen. It shows only the modules you have permission for. See Getting to know the screen and navigation.

Signature – A user’s saved digital signature. It’s required to sign steps and rows in documents. Your organization’s system administrator or Support uploads it. See Settings.

Step – A part of a document or Checklist process that a specific person or role is responsible for. You fill it in, save, and sign.

Structure – A building or part of the project. Structures determine the levels that appear in the location picker. See Structures.

Subproject – A main division of a large project, and the first level in the location picker.

Support request – A request to the QA-Online support team, with a reference number and tracking. See Support and help.

Survey order – A request to a surveyor to carry out a measurement on site, with the results entered in the system. See Tests.

T–Z#

Task – An item waiting for you to handle: an approval, a signature, or a request from a colleague. All tasks are collected on the Tasks screen. See Tasks and approvals.

Temporary password – A password you receive when your account is created, or by email after Forgot Password?. When you sign in with one, you replace it right away with a permanent password. See Sign-in and account.

Two-step verification – An extra step when signing in: after your password, you enter a verification code sent by SMS. See Sign-in and account.

Verification code – A 6-digit code sent by SMS to verify your sign-in.

View only – Permission to open and read items without changing them.

Work log – A daily record of what happened on site: workforce, equipment, weather, and work performed. See Work logs.